Savills – Performance Auditing with achieved savings

At the time of appointment, The Cube comprised a large, new build, multi-use site located in the centre of Birmingham comprising Restaurants, a Hotel, Residential, Offices, Retail, Spa & Leisure Facilities and an underground Car Park.

Energy & Technical Services was initially appointed by Savills to survey the HVAC system and complete an energy audit with a view to establishing a method of monitoring and measuring energy consumption throughout the building.

The initial survey included possible energy savings initiatives, a full asset list, plant performance, planned preventative maintenance (PPM) review, and an assessment of energy / building compliance. Energy & Technical Services were then employed to act as the Energy Managers to complete quarterly energy audits over a three-year period.

Challenge

The building comprises a total floor space of c.450,000 sqft, with multi-use tenancies, which all have different energy requirements. Careful consideration was required for any energy saving initiatives proposed. Solutions needed to remain low cost and also reflect the energy consumption requirements for the various tenancies within this complex multi-use site.

Added Value / Achievements

During the first three months, Energy & Technical Services achieved a pro-rata £25,000 per annum savings through making operational changes to the plant equipment. Energy & Technical Services also helped the client improve operational behaviour, and managed / maintained operational and energy efficiency whilst the building became more densely populated with new tenants.

Energy Survey & HVAC review completed

a pro-rata £25,000 per annum savings achieved 

related CASE STUDIES

Harris Lamb – Mechanical & Electrical Performance Specification

Successful office fit-out project with upgraded VRF heat pump cooling, LED lighting and heat recovery ventilation. Improved energy efficiency and occupant comfort led to an increase in the Energy Performance Certificate (EPC) rating from C to B.

Midcounties Co-Operative – ESOS Phase 3 Compliance

Midcounties Co-operative achieved their ESOS Phase 3 compliance successfully with a total of 346,650kWh opportunities identified and resulting in 71,896 Kg of emissions to be saved.

Woodie’s – Decarbonisation & Energy Performance Audit

Our proposed photovoltaic solution can enable the production of circa 70,000kWh of electricity annually. There is also a suggested destratification system, achieving savings of up to 20% in heating costs.